FDOT Railroad Crossing Work To Close Several Deerfield Beach Roads Next Week

by News Desk | May 15, 2026 · 8:46 am | Deerfield Beach News

FDOT railroad crossing safety work will close several Deerfield Beach crossings during the week of May 18, 2026.

Last Updated: May 15, 2026 · 8:46 am

Join the conversation.

Most reader discussion happens on our Facebook page. Follow Boca Post for breaking news and join the conversation.

This Advertising Spot Is Available

Reach Boca Raton readers daily through trusted local news coverage.

Secure this placement and get your business in front of thousands of local readers.

Limited placements available. Local businesses only.

DEERFIELD BEACH, FL (Boca Post) (Copyright © 2026) — Drivers in Deerfield Beach will see several railroad crossing closures next week as the Florida Department of Transportation begins safety improvement work at multiple crossings.

The work is scheduled to begin Monday, May 18, 2026, and will affect several crossings across the city through Friday, May 22. The closures will apply to both vehicle and pedestrian traffic at the listed crossings while crews install new safety features near the tracks.

FDOT crews will be installing Railroad Dynamic Envelopes, which are high-visibility pavement markings and vertical delineators used to define the danger zone around railroad tracks. The markings are meant to make it clearer where drivers should not stop when approaching or waiting near a crossing.

The work is expected to create short-term traffic impacts, including full closures at four crossings and lane closures at Hillsboro Boulevard.

The first closure is scheduled for NW 2nd Avenue on Monday, May 18. That crossing is set to close at 7 a.m. and is expected to reopen by late evening.

The SE 4th Street crossing is scheduled to close Wednesday, May 20. Like the other full closures, it will close to all vehicle and pedestrian traffic beginning at 7 a.m. and is expected to reopen by late evening.

The SW 10th Street crossing is scheduled to close Thursday, May 21.

The SW 15th Street crossing is scheduled to close Friday, May 22.

Each of those crossings will be closed while crews work in the area. Drivers should plan for detours and extra travel time, especially during morning and afternoon travel periods when local roads are more likely to back up around construction zones.

Work at the Hillsboro Boulevard railroad crossing will be handled differently. That location will have lane closures only, rather than a full road closure, to reduce traffic impacts on the major roadway.

Motorists are being told to follow posted detour signs and use caution near the work zones. Crews and heavy equipment will be active near the crossings during the project.

Railroad Dynamic Envelopes are designed to give drivers a clearer visual cue around railroad tracks. The pavement markings and delineators show the area where vehicles should not stop, helping keep traffic from sitting too close to the tracks when gates are down, traffic is backed up, or drivers are waiting to proceed.

The closures are scheduled one crossing at a time across the week, with each full closure expected to begin at 7 a.m. and reopen by late evening on the same day.

Residents and drivers who regularly use NW 2nd Avenue, SE 4th Street, SW 10th Street, SW 15th Street, or Hillsboro Boulevard should check their routes before traveling and allow additional time.

Questions about the work can be directed to the Environmental Services Department at 954-250-4305 or [email protected]. After-hours questions can be directed to 954-480-4373.

Additional coverage from this area is available in Deerfield Beach News.

FDOT Railroad Crossing Work To Close Several Deerfield Beach Roads Next Week.jpg

FDOT Railroad Crossing Work To Close Several Deerfield Beach Roads Next Week

Several Deerfield Beach railroad crossings will close next week as FDOT crews install new pavement markings and safety features near the tracks.

Two Boca Raton Men In Viral Lotus E-Bike Confrontation Now Face Felony Charges

Two Boca Raton Men In Viral Lotus E-Bike Confrontation Now Face Felony Charges

Two Boca Raton men are facing charges after Palm Beach County Sheriff’s Office records describe a confrontation with a 13-year-old boy inside the Lotus community.

Woodfield Burglary Suspects Tracked By Drone, K9, Helicopter

Boca Raton Police: Woodfield Burglary Suspects Tracked By Drone, K9, Helicopter

A Fort Lauderdale man is facing open felony cases after Boca Raton police say an occupied home burglary call led to a perimeter search involving K9 officers, a drone team and a Broward Sheriff’s Office helicopter.

Palm Beach County Civil Filings - May 14, 2026

Palm Beach County Civil Filings – May 14, 2026

Boca Post reviewed 65 new Palm Beach County Circuit Civil filings, including personal injury, insurance, business litigation, and foreclosure matters.

Boca Raton Morning Weather Update: Sunny Start, Rising Rip Current Danger, Storms Return This Weekend

Boca Raton Morning Weather Update: Sunny Start, Rising Rip Current Danger, Storms Return This Weekend

Friday brings a bright, warm day in Boca Raton with an onshore breeze and a growing rip current threat along the beaches. Shower and thunderstorm chances increase this weekend into early next week as a more typical late-spring pattern settles in.